Markdown · Illustrative example
Engineering Flow & Stability Review — Squad-Name — Jun 2026
Period comparison
| Signal | Previous | Current | Evidence-led read |
|---|---|---|---|
| PR Cycle Time | 4.8 days | 6.1 days | Review added 1.0 day |
| Merged PRs | 39 | 41 | Volume remained similar |
| Deployments | 12 | 15 | Deployment frequency increased |
| Change Failure Rate | 9% | 16% | 3 of 19 covered changes failed |
Current accumulation
- 12 open PRs, including 4 older than 7 days.
- Daily task WIP ended at 23, compared with 17 at the previous period end.
Tensions
- Deployment volume rose while change failures also increased; the relationship needs release context.
- PR volume stayed stable while review time increased.
Interpretation limits
- Incident linkage coverage was 84% in the current period.
- Two periods show a change, not a durable trend.
Evidence used
- PR Cycle Time — flow comparison
- DORA Metrics — stability dimensions
- Daily WIP — current accumulation